Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Dynamic Accordion Drawing | ||||||||
Line: 9 to 9 | ||||||||
Generic code
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
| ||||||||
Added: | ||||||||
> > |
| |||||||
TreeJuxtaposer | ||||||||
Changed: | ||||||||
< < | TreeJuxtaposer was not to be changed to a dynamic Accordion Drawing infrastructure as it's not a priority to support tree editing due to complexity involved with user-controlled modifications of the topology (more info needed here?). Simple editing of labels will be supported to provide renaming nodes (add/delete/rename node names through their labels) and these changes will be saved back to a new tree file. These changes are not what we consider dynamic. | |||||||
> > | TreeJuxtaposer was not to be changed to use a dynamic Accordion Drawing infrastructure as it was not a priority to support tree editing, due to complexity involved with user-controlled modifications of the topology (more info needed here?). Simple editing of labels will be supported to provide renaming nodes (add/delete/rename node names through their labels) and these changes will be saved back to a new tree file. These changes are not what we consider dynamic. | |||||||
Where new dynamic code uses | ||||||||
Line: 28 to 31 | ||||||||
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
SequenceJuxtaposer |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
Dynamic Accordion DrawingThis page is for noting the significant differences between the static versions of Accordion Drawing applications (and base generic code) and dynamic versions. Also should include new application requirements that were not satisfiable by the original code which prompted the change to dynamic Accordion Drawing.Original applications versus new changesGeneric code
TreeJuxtaposerTreeJuxtaposer was not to be changed to a dynamic Accordion Drawing infrastructure as it's not a priority to support tree editing due to complexity involved with user-controlled modifications of the topology (more info needed here?). Simple editing of labels will be supported to provide renaming nodes (add/delete/rename node names through their labels) and these changes will be saved back to a new tree file. These changes are not what we consider dynamic. Where new dynamic code uses
SequenceJuxtaposer |