Difference: GrantText (4 vs. 5)

Revision 52012-10-24 - MichielVanDePanne

Line: 1 to 1
 
META TOPICPARENT name="ResearchTips"

Current DACRRI Sample Description for use in Budget Preparation

Line: 11 to 11
 This includes installation and support of equipment; technical support for researchers; print, file and network servers; printing and copying; and similar direct costs. The estimated costs of these services for this research project are $ DollarFigure."
Added:
>
>
The estimate for the upcoming years is based on projections of actual direct costs for the previous year.
 
Changed:
<
<
In the above text, $ DollarFigure is estimated according to the current DACRRI rate (2% for 2012/2013, 5% for 2013/2014).
>
>

In the above text, $ DollarFigure is currently estimated by the department as being 2% for 2012/2013, 5% for 2013/2014). Calculate the $ DollarFigure for your grant using this estimate.

The research-related expenses for the department should be updated on a yearly basis, and the projection revised based on this.

 
<--/commentPlugin-->
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback